INDUSTRY DAY: Fort Carson Equipment Concentration Site – Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
USACE intends to conduct an Industry Day on 06 October 2026 at 0900 Mountain Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Construction Manager at Risk (CM@Risk) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release.
This acquisition will deliver a consolidated, fully functional ECS complex on an undeveloped 48-acre parcel of land at Fort Carson, CO. This site features a comprehensive range of facilities designed to support the mission of ECS-42, which is responsible for the maintenance and storage of key military assets assigned to 83 regional Army Reserve units.
The operational readiness of this military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces.
Core Facilities include:
- General Purpose Warehouse (GPW): A 39,313 square-foot (SF) secure, clear-span storage facility designed for the protection and preservation of military equipment.
- Area Maintenance Support Activity (AMSA) Shop: A 26,217 SF vehicle maintenance facility featuring advanced vehicle maintenance exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms.
- Organizational Storage Building: A 5,000 SF high-bay vertical storage facility.
- Container Storage Area: A 4,440-square-yard (SY) reinforced concrete layout for secure tactical container storage.
Supporting Infrastructure & Specialized Systems include:
- Heavy Equipment Parking & Site Work: A Military Equipment Parking (MEP) lot featuring extensive heavy-duty concrete pavements designed to withstand high-shear tracked and wheeled tactical vehicle loads, alongside POV parking, security fencing, and utility tie-ins.
- Tactical Vehicle Wash Facilities: Two dedicated, high-capacity vehicle wash racks/platforms featuring industrial filtration and water-recycling systems.
- Bi-Level Loading Ramp: A reinforced bi-level loading ramp designed to facilitate the rapid loading and unloading of heavy armored vehicles onto transport carriers.
- Specialized Foundations: Geotechnical engineering solutions, including deep foundation systems and soil stabilization, to mitigate volatile soil conditions across the 48-acre site.
- Fire Protection: Advanced fire detection and suppression systems, including specialized solutions for high-bay maintenance areas and hazardous material storage, compliant with all relevant UFC and NFPA standards.
- Cybersecurity: Facility-related control systems will be designed and implemented in accordance with UFC 4-010-06, ensuring the cybersecurity of all networked building systems.
- UFC Compliance: The entire facility complex will be designed and constructed to meet all applicable Unified Facilities Criteria (UFC), including AT/FP (Antiterrorism/Force Protection) standards and sustainable design principles as outlined in the Army Sustainable Design and Development Policy.