This Industry Day is being held to gauge industry’s ability and capability to upgrade the existing heating infrastructure at building 1515. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system. at Hill AFB. For additional detail please refer to the attached SOW.
We will meet up at the south gate at Hill AFB to gain all contractor access to the base and travel to bulding 1515 to walk the construction area where the new boiler system will be on the 12th of August at 0830. The walk will start at 0900 so if you have access to the base please let me know.